The Challenge:
The design and construction work comprised:
- 1328m of new embankment on a set-back alignment
- Raising of 2,356m of existing embankment crests
- Creation of 7 Ha of compensatory intertidal habitat.
- Improvements to Sampsons and Mill Leaze Sluice
- Identification of borrow areas to provide suitable fill material for construction of the new embankments
- Devise and install suitable mitigation measures for protected species

The Solution:
Our Team’s Achievements
Design and Build: Matt Phillips and the team worked extremely closely with the design team to ensure buildable cost-effective designs.
Collaborative Working: Matt Phillips acted as a single point of contact to complete the scheme. Tony Bracey managed the earthworks throughout construction working collaboratively with our key strategic suppliers.
Minimal Disruption: Our design and build approach ensured disruption to the local public was minimised by minimising the use of the local road network. Our design included provision for all the borrow pits to source material directly from the working area.
Programme: TVO managed key constraints using our Total Programme Management approach. Our programme was fully resourced and directly linked to our cost forecast tool for accurate timely financial reporting. The team liaised with Natural England to meet their requirements for minimising disruption to over wintering birds. The scheme was delivered on time and on budget.

The Impact:
Our Team’s Achievements
Safe: Our team set up people free working areas using GPS equipped plant. This ensured that we were able to effectively manage people/plant interfaces. They also had to manage a cycle route through our works and maintain access for the local farmers working the land within our site. This included inducting farmers and EA operatives to ensure they fully understood the procedures to enable access within our working area.
Environment: Mitigation measures were in place and regular checks for nesting birds and hares were completed in all areas prior to our entry. Cost effective Great Crested Newts mitigation was maintained throughout the works, preventing a costly translocation programme.
Stakeholder Management: Our team negotiated borrow pit locations with landowners. Throughout the scheme our team attended Parish Council meetings to discuss the scheme and display plans of our proposed works, and the public informed with monthly newsletters.
View more projects
Every project we deliver is an opportunity for us to bring our unique thinking to solve problems, innovate and collaborate with our clients and beyond.
Berkeley Green & UTC South Gloucestershire & Stroud College (SGS)
Rising from the ashes of a decommissioned former nuclear site, SGS Berkeley Green, a converted 1940’s engineering hall, and new University Technical College (UTC) are the first educational buildings to be completed on a new ground-breaking GREEN campus, within Gloucestershire Science and Technology Park.
Southern Resilience Scheme
Delivering a new £27m and 30.5km pipeline for Bristol Water, overcoming biodiversity and sustainability issues, handling the logistics presented by the pipeline passing through five towns and bringing improved water supply to 280,000 customers.
Hinkley Point C
Major Earthworks project to prepare for construction of UK’s first nuclear power station for a generation.
Global Student Accommodation (GSA), Exeter
We completed Clifford House, a student housing association project, for Global Student Accommodation (GSA), two weeks early. It’s our second project for GSA and provides state-of-the-art student accommodation for 312 students studying at Exeter University.
Gloucester Transport Hub
A unique and distinctive regeneration project promoting Gloucester’s unparalleled heritage from archaeology to aviation. The Hub is a highly symbolic part of the rejuvenation of the main entry point into the city, a gateway used in Roman times which is now served by both road and rail.
Cheltenham Ladies College, Fitness Centre
The addition of high-class sport and leisure facilities for one of the UK’s most distinguished private schools has created flexible, multi-purpose spaces wrapped around the existing centre. Alongside a new sports hall, activity studios, squash courts and a gym, are additional changing rooms, a MUGA and new car park.
Congresbury Yeo tidal defences
Kier worked as part of Team Van Ord (TVO) to improve the standard of protection provided to 39,741 properties in the towns and villages of Worle, Weston-Super-Mare, Kingston Seymour and Wick St Lawrence by improving the 3670m of earth bank tidal defences lining the Congresbury Yeo Estuary.
St Sidwells Point Leisure Centre
Creating the UK’s first Passivhaus standard ultra-low carbon leisure centre, designed to save up to 70% on annual energy costs.
The Steart Coastal Management Project
Kier worked as part of Team Van Ord (TVO) on The Steart Coastal Management Project which was the UK’s largest coastal management scheme, helping to protect homes and business from flooding due to climate change and rising sea levels.
Aerospace Bristol
Creating a new £19m aviation museum showcasing the role played by the Bristol site in Britain’s aviation history, including a hangar to house the last Concorde ever to fly, restoring a Grade 1 listed First World War hangar to create an exhibition space
Cheltenham Racecourse Redevelopment
Delivering a new 6,500-capacity 5 ½ storey grandstand at one Britain’s most iconic racecourses.
Stolford Flood Defence Scheme
Kier installs first Dutch flood protection system in UK to help Environment Agency protect Somerset homes and agricultural land.
Browns Hill & Horn Hill Steps, Water Main Replacement
Mains replacement scheme in historically sensitive area.
MEICA Capital Works Framework
Kier delivers work for South West Water (SWW) under the ‘MEICA Capital Works Framework’, a multi-disciplinary framework for maintenance, refurbishment and the expansion of water treatment and sewage treatment works.
Hampton by Hilton, Bristol Airport
The construction of a hotel consisting of 201 bedrooms over four floors, utilising significant offsite manufacture.
Trade City and Logistics City
Developing more than six million sq ft of award winning speculative industrial space, with sizes ranging from small start-up to national distribution units through Kier Property's Trade City and Logistics City brands.
St Mary’s Harbour
Kier used our marine expertise to undertake improvement works to St Mary’s Harbour on the Isles of Scilly, located within areas of national and international environmental and ecological protection.
Falmouth School Sports Pavilion
The design and construction of a sports pavilion, including FA compliant changing facilities, gym, office space and flexible recreation areas. In addition a first floor balcony was incorporated into the design which overlooks the sports pitches.
Cathedral School
Creating a two-form entry primary school within a Grade 1 listed building.
Lyneham Defence Technical Training Centre
Redeveloping RAF Lyneham as a world-class Ministry of Defence training centre.
Finlake Leisure Pool
Designing and constructing a new leisure complex within this holiday village on the edge of the Dartmoor National Park in Devon, including toddler and 20m adult swimming pools, Tornado and Twister flume rides, and water playground, gymnasium, other leisure facilities and associated plant and equipment.
Elland Bridge Refurbishment
Rebuilding the Elland Bridge after the 19th century original was completely destroyed in the 2015 Boxing Day floods.
New water mains connection
Customers benefit from innovation delivering a faster new connection in Newton Abbot.
The Chase SEN
Converting and regenerating a disused engineering building at South Gloucestershire and Stroud College to create striking new modern facilities for disabled students.
Dyson, Hullavington
The design and redevelopment of a World War II hanger, to create a new research and development centre for Dyson.
Shire Hall
The re-emergence of Gloucestershire County Council’s (GCC) Shire Hall after its retrofit and refurbishment reads like a fairy-tale. Over 165 weeks and 82 phases of collaborative, innovative team-working, the part-listed, part 1960’s building, an eyesore, tired and inefficient, was responsibly and dynamically transformed into an elegant and highly sustainable workplace.
Plymouth Central HUBER alternative dewatering scheme
Replacing existing ageing centrifuge assets with a, first of its kind, application of the HUBER Q-Press. This improved odour control measures, reduced chemical consumption and halved annual operating costs at Plymouth Central Sewage Treatment Works, as part of South West Water’s MEICA Framework.
NHS Nightingale Bristol
Converting the University of West England conference centre into a temporary hospital in just 20 days, providing increased capacity for the NHS following the outbreak of COVID-19.
Keeping customers connected during COVID-19
Providing a 24/7 reactive service to South West Water during the COVID-19 lockdown to ensure the network could cope with increased water demand. Adopting new ways of working to maintain social distancing.
Toddbrook Reservoir Spillway Emergency Response
Emergency response to prevent the failure of the auxiliary spillway at Toddbrook Reservoir, Whaley Bridge.
Ecclesiastical Insurance Group Headquarters
Ecclesiastical Insurance Group, one of Gloucester’s biggest employers, had offices throughout the city which were not considered future proof. They decided to consolidate all Gloucester based staff into a new purpose-build headquarters on Gloucester Business Park. The building is leased from Arlington, owners of the business park, and long-term clients of Kier.
Loe Bar Outfall Winter Readiness
Replacing eroded concrete along a 40m length of Loe Bar Outfall by spraying concrete on the front and top face of the outfall and around the inspection chamber. The works had to be completed by the end of October 2020.
Helston (River Cober) Flood Alleviation Scheme
The development of a CL:AIRE Materials Management Plan (MMP), enabled the use of soils, which would normally be classified as waste, from a local development site within flood banks on the Helston (River Cober) Flood Alleviation Scheme, Helston, West Cornwall.
Iffley Academy
New-build construction of a community Special Academy judged ‘outstanding’ by Ofsted in 2019, for pupils up to the age of 18 with complex special educational needs and disabilities. The new academy replaces unfit for purpose old buildings, adding animal care, horticulture and construction facilities, a mock flat and pupil-run café.
Whitelands Academy, Kingsmere
A brand new 600 pupil secondary academy school for years 7-11, built to support Kingsmere, a new housing development in south-west Bicester. Constructed to BREEAM principles, the academy features 26-classrooms, SEN provision, a four-court sports hall built and fitted to Sport England standard, external social spaces and multi-use games areas.
Clearwater Primary Academy
A ‘Forever Home’ for a nomadic Primary School which originally operated from dilapidated portacabins and then moved to occupy converted offices with no playground. The new Academy is a spacious home to 67 pupils but allows for 420-student capacity as the new housing developments in the area become occupied.
Cattle Market Road, Bristol
Saving carbon, fuel and costs through the use of Solar Hybrid Towers at Cattle Market Road site in Bristol
Dubai Harbour Infrastructure and Logistics
Kier International was awarded the Dubai Harbour Infrastructure and Logistics package in 2018.
The Dubai Harbour development will be a major mixed used development situated off the coast of Dubai providing two terminal buildings with two cruise liner berths, a marina consisting of 1,100 berths, dock master buildings, a yacht club, residential towers and a landmark Light house.
Quayside House
Phase one of the Quayside regeneration master plan in Gloucester City Centre is a 3-storey multi-purpose building, including two GP surgeries to serve 18,000 people. It was constructed on the footprint of the original Quayside House, a 1960’s facility which had reached the end of its life.
Burghfield breach
In late October 2021, following a sustained period of heavy rainfall and rising water levels, the Kennet and Avon Canal breached its banks near the village of Burghfield in Berkshire. Our emergency response team was mobilised quickly to assess the damage and the impact of flood waters on the surrounding area.