The Challenge:
Procured through the P21+ framework, Kier were appointed by the Frimley Health NHS Foundation Trust (FHFT ) to redevelop the Wexham Park and Heatherwood Hospitals estate. Our second project was to redevelop the emergency care services at Wexham Park Hospital, following the successful completion of the Wexham Park Hospital Women's Services refurbishment and extension.
The original proposal comprised a refurbishment and expansion of the existing emergency department (ED). However, through working in partnership with the Trust it was determined that it would not address the current pressures of the ED or the predicted future attendance levels.
A new scheme was designed, based on the implementation of a new model of care and bringing together emergency & ambulatory care and assessment units together under one roof, essentially creating a ‘one-stop’ emergency and assessment facility.

The Solution:
Kier worked closely with FHFT throughout the P21+ design and delivery process, ensuring that all critical milestones were met. The new centre was located at the front of site, adjacent to the main entrance and a busy public car park, which required a well managed logistical management plan throughout the construction phase whilst the hospital remained fully operational.
Opened in March 2019, the new Wexham Park Emergency Assessment Centre (EAC) is split over four floors, the 9,300m² facility was split as below:
Ground floor – The new emergency department (ED), which is one-third larger than the old ED including 30 single 'majors' rooms, eight resus rooms and 10 assessment rooms, as well as separate children's and minor’s areas.
First and second floor - A total of 84 short-stay beds for treating and assessing patients with 34 ’24 hour’ beds and 20-cubicle ambulatory emergency care unit on level 1 and 36 ’72 hour beds’ and 16 surgical short stay beds on Level 2.
Third floor - comprises space for staff areas and equipment rooms.
Offsite and modern methods of construction were critical to the project, reducing both time and labour. Modular corridors and plant equipment were utilised, saving an estimated eight weeks from the project scope.

The Impact:
Wexham Park Emergency and Assessment Centre was handed over to a delighted customer in February 2019, ahead of a Royal opening in the summer. The project was completed ahead of schedule, using modern time-saving techniques. The programme been shortlisted for a national Gold Award by the Considerate Constructors Scheme.
This project has been one of the first in the UK to model the United States’ design for emergency departments, bringing together the emergency department, ambulatory care and assessment units under one roof. This will improve delivery times through bringing care to the patient rather than moving around specialist units.
Kier continues to work in collaboration with Frimley Health NHS Foundation Trust, delivering the £98m transformation at Heatherwood Hospital in Ascot.
" I am absolutely delighted with the finish and it looks a really magnificent building. Your team and Kier should be very proud. I cannot wait until our first patients get to experience care in the building - it is such an improvement upon the existing building. "Janet King Director of HR & Corporate Services Frimley Health NHS Foundation Trust
Client Testimonial
Project Overview
View more projects
Every project we deliver is an opportunity for us to bring our unique thinking to solve problems, innovate and collaborate with our clients and beyond.
The Fulmar
The Fulmar is part of the Greenwich Peninsula Regeneration Scheme, consisting of three residential blocks, comprising 139 flats, surrounding a central landscaped podium courtyard. The blocks range in height from four to 10 storeys, housing 60 apartments for outright sale, 19 for intermediate (shared ownership) and 60 for rent properties.
Wexham Park Hospital Emergency Department and Assessment Centre
The design and build of a £36m emergency department and assessment centre, creating one of the most innovative care units in the NHS.
Bolanachi Building cladding and fire stopping works
A cladding project delivered using an innovative Gridline System and underpinned by strong resident engagement.
Greenwood Centre
Redevelopment of 25 & 37 Greenwood Place to provide a new 3,600m2 resource and community services centre run by people with disabilities, for people with disabilities. As part of Camden Council’s Community Investment Programme (CIP) it forms a hub for all services that was previously spread across the borough.
South Bank Place multi-utility design project
A short-term central London consultancy project turned into a ground-breaking multi-utility project, moving eight utilities to prepare for a new 800-apartment development, setting the standard in how these projects should be delivered in the capital.
Morley House
The redevelopment of a Grade II listed block on London's Regent Street providing 1,021m² of high-quality retail space on ground and basement level, and 44 new homes for market rent. Achieving the equal highest Considerate Constructors Scheme score ever recorded in London.
Crossrail
Constructing two railway tunnels that run for 6.4km between the Royal Oak portal and the new Farringdon Crossrail station in Central London. Huge scale building of station tunnel caverns at Bond Street, Tottenham Court Road and Farringdon for the new Elizabeth line.
Tapestry, King’s Cross
Tapestry provides an outstanding collection of one, two and three bedroom apartments, townhouses and penthouses. Set over 10-15 storeys, the 33,000 sq m development integrates extensive public realm and leisure facilities for the residents of the 129 apartments.
NHSBT Barnsley
Fit-out of a new, purpose-built development in Barnsley for use by NHS Blood and Transplant as a specialist research, storage, and logistics facility for the wider NHS, replacing facilities in Sheffield and Leeds to ensure efficiencies and improve services.
5 Pancras Square
One of the most sustainable mixed-use building in the country and winner of the Prime Minister’s Better Public Building award.
North Middlesex University Hospital
Our North Middlesex University Hospital (NMUH) project was a £53.6 million re-development comprising of 5 separate projects including units for Strokes, HIV, Women’s & Children’s Services, retained estates, infrastructure and external works. We treated each unit as an individual project with its own project team.
Delivering high quality and value for money fire safety works
Deliver a full range of fire safety works annually, including compartmentalisation, warning systems and fire doors across a range of property types with a wide geographical spread.
Parkside Estate: planned maintenance
Delivering a major programme of internal and external planned works for Clarion Housing across 17 high-rise blocks in East London. The programme included kitchen and bathroom updates, mechanical and electrical renewals, roof, brickwork and concrete repairs, groundworks, fire safety and redecorations.
Kier and TfL prove full closures are the future
Kier’s emergency road closure on the A2 proves full closures are the way forward for 2019’s network management programme.
A13 Road Widening Project
The A13 Road Widening Project is being delivered by Kier on behalf of Thurrock Council. The works include adding an additional lane in both directions between Orsett and Stanford-le-Hope and replacing four bridges. It will support economic growth, reduce congestion and enhance safety.
Liverpool, Adult Health and Social Care Transformation
Liverpool City Council's challenge involved delivering a multi-million programme of works, across five projects.
York Hospital, Endoscopy Unit
Construction of a new build steel-framed £9m endoscopy unit on top of the existing physiotherapy building at York Hospital
Diana Princess of Wales Hospital Staff Accommodation
Construction of new staff accommodation at Diana, Princess of Wales Hospital for staff and student nurses
Planned Works Framework
We deliver works to a broad variety of property archetypes, including leasehold properties, purpose-built and conversion flats, terraced, detached and semi-detached houses, estates-based properties, high and low rise blocks, sheltered housing and listed buildings.
The Aperture
The Aperture is the first phase of residential buildings on the Greenwich Peninsula. This five storey building comprises of a restaurant and deli on the ground floor, day nursery on the first floor, estate management and a community centre on the second/third floors with a gym on the remaining floors.
Strategic Development Control Plan, Capital and Estates & Sustainability Programmes
Kier successfully delivered a programme of 23 projects across two strategic Trusts estates which included MRI, Renal, Pathology, Laminar flow Theatre, Theatre Recovery, Paediatric assessment, A & E, Wards A,B,C & D, Chemotherapy, Catering, Fire Protection Works & Orthodontics.
Watford Riverwell
Delivering the £450m Watford Riverwell as a 15-20 year joint venture with Watford Borough Council, which involves regenerating 70 acres of land in West Watford to create residential, office, retail, leisure, industrial and hotel space.
Sainsbury Wellcome Centre
A unique, world-class, state of the art neuroscience research institute at University College London.
Slade Green Regeneration
The simultaneous extension and refurbishment of two neighbouring primary schools.
Thames Lodge, St Bernard's Campus
Kier have been working in partnership with West London Mental Health NHS Trust since 2003.
Westminster Bridge South Scheme
Easing congestion at this iconic London tourist location by integrating and coordinating pedestrian, cycling and traffic movements; using detailed planning techniques and innovative use of materials to minimise closure locations and durations; and responding quickly to changing security requirements after a terrorist attack just before the work was to begin.
58 Victoria Embankment
Located on the River Thames Embankment, this project involved the demolition of the existing building behind a retained façade and the construction of a new steel framed Cat A office with a concrete basement. Inside the building, being the main feature is the central atrium and 3 scenic glass lifts.
Wexham Park Women's Services
The redevelopment of Wexham Park Hospital Women’s Services consisted of the remodelling of the Maternity and Gynaecology Facilities. This forming brand new, state of the art facilities for Slough and the surrounding areas.
Harris Girls' Academy Bromley
The demolition, refurbishment and three-story new build of a local all-girls school located in South London.
Kingston’s Portsmouth Road
Transforming a London Borough of Kingston Road into a model for healthy streets. Creating cycle tracks and cycle parking, whilst communicating with local residents and businesses.
Howick Place
Situated close to Westminster Cathedral, Howick Place is an architecturally stunning building designed by Rolfe Judd Architecture. The building takes inspiration from the surrounding conservation area, whilst creating an environment to meet all 21st century needs.
Hopewood Campus
Creating a purpose-built facility for Child and Adolescent Mental Health Services (CAMHS) and Perinatal Services. Providing support for adolescents, pregnant women, and women with a babies up to one year old who are experiencing mental health difficulties.
Gatwick Airport Car Park 6
Designing and structurally refurbishing one of Gatwick Airport's largest multi storey car parks, expanding parking and storage areas, and working with many stakeholders to ensure that all safety, quality and commercial aspects were delivered in accordance with the airport’s stringent standards.
Fixed Telecom Network
The biggest telecoms project ever on Britain's railways.
Rotherham Hospital Integrated Urgent Care Centre
Developing a new build Integrated Urgent Care Centre over two storeys at Rotherham Hospital, with refurbished and extended level B areas for new Fractures, Majors, Resuscitation and RAT departments.
Chalcots Estate, call to action fire risk work
Assisting with the evacuation of 650 families from the estate after receiving a call from Camden Council at 5.30pm on Friday 23 June 2017, undertaking emergency fire remedial works, working overnight to fit fire door closers and carrying out an additional programme of fire upgrade works.
Bank Station Capacity Upgrade
Delivering a 100% BIM3 compliant utilities design at one of London’s busiest interchanges, Bank Station. Serving 73 million passengers annually, situated between London Bridge and the Bank of England.
The Grove School
Undertaking a major refurbishment of a former Council building, originally a late Edwardian school, into a new school in Haringey, for 104 students aged 5–19 who have a primary diagnosis of autism.
Tiger Way
Kier Design and Business Services working in partnership with the London Borough of Hackney to deliver mixed-use developments and education schemes to create revenue for further local investment.
33 Foley Street
Delivering a central London office space where people feel inspired and want to work and collaborate, bringing together a number of Kier businesses to work jointly on the project, adding an extra floor to the building and extending two other floors to create a stunning modern space.
Wedge House
Building a striking new build boutique hotel with works comprising the design, construction and fit out of 192 hotel rooms, 4,700m2 Cat A office space and full fit out of three floors of bars and restaurants.
Alperton Community School
The build of a new school and demolition works of the old premises, increasing capacity from 750 to 1700 pupils.
Millstream Tower
Demolition of an existing structure followed by the design and construction of a new 22 storey residential development of 128 dwellings and one commercial unit. This is our seventh project completed for Newlon Housing Trust.
PET-MRI Facility, Royal Hallamshire Hospital
Construction and fit-out of a concrete-framed, two-storey PET-MRI facility at the Royal Hallamshire Hospital in Sheffield, a joint project for the University of Sheffield and Sheffield Teaching Hospitals NHS Foundation Trust.
Q Floor, Royal Hallamshire Hospital
Refurbishment of the Royal Hallamshire Hospital’s Q Floor from ward space into four new orthopaedic theatres, recovery area, staff changing, support stores and additional ancillary areas, located on the 14th floor of the hospital
Woolwich Polytechnic School for Girls
Building a brand new 8 form of entry school situated in Thamesmead in South East London. The new school holds 1,200 pupils and includes teaching spaces, science laboratories, ICT suites, a dance studio, art and music rooms plus a large four court sports hall and hard court play area.
Mersey Care ‘Rowan View’ Medium Secure Unit
Providing class-leading medium secure mental health facilities in Liverpool, this 123 bed mental illness and learning disabilities medium secure facility was procured through P21+. It is split across eight wards with supporting accommodation, on the Maghull Health Park.
Ambulatory Care and Acute Diagnostics Building, Heartlands Hospital
University Hospitals Birmingham NHS Foundation Trust appointed Kier through the P22 Framework to deliver a brand-new centre to Heartlands Hospital. The exciting project will bring world-class facilities and house a wide range of health services, caring for circa half-a-million patients each year.
Atherleigh Park Mental Health Unit
Atherleigh Park has set the standard for the design of adult inpatient mental health accommodation, providing a healthy, therapeutic environment for residents that promotes their physical and mental wellbeing.
Mitford Adult Autism Unit
The Mitford Unit Adult Autism Unit provides high-quality accommodation for adults with autistic spectrum disorders in a calming, therapeutic and safe environment that has incorporated design best practice from around the world.
NHS Louisa Jordan
Converting the Scottish Event Campus in Glasgow in to a temporary hospital in just 20 days, providing facilities for 1000 patients.
Swansea Bay Field Hospital
Converting the Bay Studios in Swansea in to a temporary hospital, providing facilities and delivering infrastructure for 1000 patients.
NHS Nightingale Bristol
Converting the University of West England conference centre into a temporary hospital in just 20 days, providing increased capacity for the NHS following the outbreak of COVID-19.
Great Ormond Street Hospital (GOSH) Khoo Teck Puat iMRI Suite
Our Great Ormond Street Hospital (GOSH) iMRI project involved the construction of a three-storey building, adjacent to their existing theatres in the centre of their site, for a new iMRI suite and rehabilitation gym. The new MRI scanner was integrated into the new operating theatre to create a seamless brain imaging process during surgeries.
Spa School, Camberwell
Spa School Camberwell is a co-educational special school for students aged 5 to 16 with autism. Construction works included the structural alteration, internal remodelling and fit out of a three storey Victorian building with a three storey new build extension. It has the capacity for 120 students and 80 staff.
NHS Golden Jubilee Surgical Centre, Clydebank
The new Golden Jubilee Surgical Centre in Clydebank, Glasgow will provide a range of first-class facilities, including theatre suites; a surgical admissions and recovery unit (SARU); a surgical administration space; central sterilising and processing department facilities; endoscopy unit; orthopaedic amenities; outpatient and pre-operative spaces; as well as staff wellbeing spaces.
Addington Valley Academy
Design and construction of an all through SEND school, funded by the Department for Education and managed by Orchard Hill College Academy Trust. The school specialises in autism and complex needs for up to 150 pupils aged 2–19 and offers a wide variety of special learning environments including sensory/calm spaces and emotional literacy support rooms.
80 Grosvenor Street
80 Grosvenor Street is located in Mayfair, London and provides 17,500 sq ft state of the art office and retail accommodation over five storeys behind a partially retained Georgian façade. It includes high-end interior finishes, private terraces with panoramic views and luxurious contemporary spa style amenities.
Heatherwood Hospital
The design and build of a £98m state-of-the-art facility using the latest technology to deliver outstanding services to NHS and private patients across Berkshire, Hampshire, and Surrey.
NHS Golden Jubilee
Kier is utilising modern methods of construction (MMC) throughout the build of this surgical centre, including a hybrid pre-cast concrete frame and facade, cast in service support systems, and pre-manufactured riser and corridor service modules.
10 Lewis Cubitt Square
10 Lewis Cubitt Square forms part of the 67-acre King’s Cross Central Limited Partnership (KCCLP) redevelopment. It is a mixed-use 12 storey commercial development for tenant Meta, built to CAT A fit-out standard and offering nine floors of flexible office space. It also includes a large flexible retail unit at street level plus a 600-seat theatre.
10 Lewis Cubitt Square
A 250,000 sq. ft mixed-use building in King’s Cross which incorporated various forms of modern methods of construction (MMC) including a large slipform core, precast concrete floor units, a complex two layered precast concrete façade and unitised curtain walling, prefabricated mechanical, electrical and plumbing (MEP) components, and modular toilets.
Royal Brompton Hospital Diagnostic Centre
A new diagnostic centre which combines specialist diagnostic services in one space, providing MRI, CT, ultrasound, echocardiogram, interventional radiology, transoesophageal echocardiogram (TOE) and bronchoscopy scanning facilities in one of the world’s leading heart and lung hospitals.