The Challenge:
The development of the new endoscopy unit at York Hospital was complex. Positioned on top of the existing physiotherapy unit, the site was live and extremely restricted, with the sleep sciences and renal units on either side of the physiotherapy unit, just metres away. This was the best location to build in; the hospital is otherwise surrounded by busy main roads and homes.
It was vital to ensure that the existing physiotherapy building was strong enough to bear the weight of the new endoscopy unit. This required surveys to locate the positions of the physiotherapy unit’s structural pillars and ensure that they were suitable to take the additional weight. Extensive groundworks were needed to reinforce the physiotherapy unit’s foundations, with care taken not to undermine the foundations of the neighbouring sleep sciences and renal units.

The Solution:
The endoscopy unit is steel-framed, with a lightweight SFS to create internal walls, and gold cladding. The unit connects to the main hospital at first floor level via a link bridge. During construction, infection prevention-approved secure solid hoardings separated the site from the hospital, and all doors leading into the hospital were locked at all times. The site team worked in collaboration with hospital staff to ensure that the Trust’s specialist needs were met, and to ensure that day to day operations were not disrupted.
For example, the hospital’s main delivery route ran directly through the site; to prevent blocking deliveries to the hospital, the site would open the gates to allow delivery vehicles access once work had stopped for the day. The gates to site were closed through the day to prevent the public from accessing the site.

The Impact:
The endoscopy unit was delivered on time to the required high standard, producing a fantastic new building which allows for improved treatment while increasing the capacity of the endoscopy department. The Trust are delighted with the new building; following project completion, the site team held several visits for York Hospital staff to the new unit before it opened, receiving positive feedback.
The project received a Considerate Constructors score of 40. Particular praise was given to the site team for their minimisation of disturbance to the hospital’s day to day running and both fundraising and sponsorship of charities for local causes.
The completion of the endoscopy unit at York Hospital marks 15 consecutive years of working in partnership with York Teaching Hospital NHS Foundation Trust.
" This is an exciting development for the Trust and it will transform our service into a centre of excellence for endoscopy, providing enhanced high quality care to our patients. "Brian Golding Director of Estates and Facilities York Teaching Hospitals NHS Foundation Trust
View more projects
Every project we deliver is an opportunity for us to bring our unique thinking to solve problems, innovate and collaborate with our clients and beyond.
Wexham Park Hospital Emergency Department and Assessment Centre
The design and build of a £36m emergency department and assessment centre, creating one of the most innovative care units in the NHS.
Greenwood Centre
Redevelopment of 25 & 37 Greenwood Place to provide a new 3,600m2 resource and community services centre run by people with disabilities, for people with disabilities. As part of Camden Council’s Community Investment Programme (CIP) it forms a hub for all services that was previously spread across the borough.
Mersey Gateway Project
One of the largest infrastructure initiatives in the UK encompassing a new six-lane toll bridge over the River Mersey along with 9km of local road upgrades. Construction was carried out by Merseylink Civil Contractors, a joint venture between Kier Infrastructure, Samsung and FCC.
M6 J16 to J19 smart motorway project
Cheshire’s first smart motorway from Crewe to Knutsford. Converting a 20 mile stretch of the M6 into an ‘all lane running’ smart motorway; creating much needed extra capacity and more reliable journey times. It will reduce delays and excessive congestion for the 120,000 (approx.) vehicles that use it each day.
St Julie’s Catholic High School
Building a new school for 1,100 students within the grounds of the original. Abiding by strict environmental regulations and generating a wealth of social value within the local community.
NHSBT Barnsley
Fit-out of a new, purpose-built development in Barnsley for use by NHS Blood and Transplant as a specialist research, storage, and logistics facility for the wider NHS, replacing facilities in Sheffield and Leeds to ensure efficiencies and improve services.
Reconnecting Cumbria on the A591
Clearing and repairing damaged sections of the A591 hit by storms in 2015/16, working with Cubby Construction on behalf of Highways England, operating in volatile conditions and completing the project three weeks early followed by a reopening ceremony performed by HRH Prince of Wales.
Pall Mall, Liverpool
Kier was selected by Liverpool City Council to deliver a new mixed commercial quarter known as Pall Mall, in partnership with CTP.
North Middlesex University Hospital
Our North Middlesex University Hospital (NMUH) project was a £53.6 million re-development comprising of 5 separate projects including units for Strokes, HIV, Women’s & Children’s Services, retained estates, infrastructure and external works. We treated each unit as an individual project with its own project team.
Storyhouse
Developing Chester's largest and most ambitious ever creative project, working in a restricted city centre location, adapting the programme when a Roman building was discovered on site, restoring and revitalising a Grade II Listed building, creating new cultural spaces and receiving the Arts Council's highest ever score for a building.
Heron House
Refurbishment of a six-storey vibrant public building in Manchester City Centre, creating over £12.2m of social return on investment.
Liverpool, Adult Health and Social Care Transformation
Liverpool City Council's challenge involved delivering a multi-million programme of works, across five projects.
York Hospital, Endoscopy Unit
Construction of a new build steel-framed £9m endoscopy unit on top of the existing physiotherapy building at York Hospital
Fire safety delivery and resident liaison
Delivered fire stopping and compartmentalisation to 18 fully occupied tower blocks carrying out works on a strict weekly timetable to minimise disruption to residents.
Diana Princess of Wales Hospital Staff Accommodation
Construction of new staff accommodation at Diana, Princess of Wales Hospital for staff and student nurses
FA Parklife
As part of the Football Association’s master-plan to build new football facilities in 30 cities by 2020, Kier have successfully delivered four all-purpose football hubs using state of the art 3G artificial grass at key grass-root areas across Liverpool.
Alfred H Knight's Office and Analytical Laboratory
Alfred H Knight is a commodity analysis and mining support specialist who required our design and cost management services to build a new state-of-the-art head office and analytical laboratory.
Strategic Development Control Plan, Capital and Estates & Sustainability Programmes
Kier successfully delivered a programme of 23 projects across two strategic Trusts estates which included MRI, Renal, Pathology, Laminar flow Theatre, Theatre Recovery, Paediatric assessment, A & E, Wards A,B,C & D, Chemotherapy, Catering, Fire Protection Works & Orthodontics.
Sensor City
Creating a ‘Knowledge Quarter’ for Liverpool, a collaboration between the University of Liverpool and Liverpool John Moores University, delivering a highly adaptable research environment and incubator space for start-ups and SMEs who are developing digital sensor technologies and applications.
Thames Lodge, St Bernard's Campus
Kier have been working in partnership with West London Mental Health NHS Trust since 2003.
Wexham Park Women's Services
The redevelopment of Wexham Park Hospital Women’s Services consisted of the remodelling of the Maternity and Gynaecology Facilities. This forming brand new, state of the art facilities for Slough and the surrounding areas.
Materials Analysis Laboratory
New head office and analytical laboratory for metallurgical consultants.
Hopewood Campus
Creating a purpose-built facility for Child and Adolescent Mental Health Services (CAMHS) and Perinatal Services. Providing support for adolescents, pregnant women, and women with a babies up to one year old who are experiencing mental health difficulties.
Rotherham Hospital Integrated Urgent Care Centre
Developing a new build Integrated Urgent Care Centre over two storeys at Rotherham Hospital, with refurbished and extended level B areas for new Fractures, Majors, Resuscitation and RAT departments.
Urenco Tails Manufacturing Facility
Kier worked as the main contractor to deliver a facility for processing ‘tails’, a by-product of the uranium enrichment process.
Crewe Lifestyle Centre
Creating a viable and affordable facility that brought all Crewe's lifestyle services - pool, gym, sports hall, library, specialist daycare and family service facilities - together under one roof, meeting a diverse range of user needs and building within a constrained town centre site.
Huntington Community Primary School
Blending traditional and innovative solutions to create a new-build, two-storey, 420-place primary school and 26-place nursery in Chester.
Oldham Town Hall
Restoring an iconic building, taking part in feasibility studies to decide the best use of the building, working on the project to turn it into a seven-screen cinema with restaurants, coffee shop and retail units, winning multiple industry awards and creating something of huge importance to local people.
PET-MRI Facility, Royal Hallamshire Hospital
Construction and fit-out of a concrete-framed, two-storey PET-MRI facility at the Royal Hallamshire Hospital in Sheffield, a joint project for the University of Sheffield and Sheffield Teaching Hospitals NHS Foundation Trust.
Q Floor, Royal Hallamshire Hospital
Refurbishment of the Royal Hallamshire Hospital’s Q Floor from ward space into four new orthopaedic theatres, recovery area, staff changing, support stores and additional ancillary areas, located on the 14th floor of the hospital
Mersey Care ‘Rowan View’ Medium Secure Unit
Providing class-leading medium secure mental health facilities in Liverpool, this 123 bed mental illness and learning disabilities medium secure facility was procured through P21+. It is split across eight wards with supporting accommodation, on the Maghull Health Park.
Ambulatory Care and Acute Diagnostics Building, Heartlands Hospital
University Hospitals Birmingham NHS Foundation Trust appointed Kier through the P22 Framework to deliver a brand-new centre to Heartlands Hospital. The exciting project will bring world-class facilities and house a wide range of health services, caring for circa half-a-million patients each year.
Atherleigh Park Mental Health Unit
Atherleigh Park has set the standard for the design of adult inpatient mental health accommodation, providing a healthy, therapeutic environment for residents that promotes their physical and mental wellbeing.
Mitford Adult Autism Unit
The Mitford Unit Adult Autism Unit provides high-quality accommodation for adults with autistic spectrum disorders in a calming, therapeutic and safe environment that has incorporated design best practice from around the world.
NHS Louisa Jordan
Converting the Scottish Event Campus in Glasgow in to a temporary hospital in just 20 days, providing facilities for 1000 patients.
Swansea Bay Field Hospital
Converting the Bay Studios in Swansea in to a temporary hospital, providing facilities and delivering infrastructure for 1000 patients.
NHS Nightingale Bristol
Converting the University of West England conference centre into a temporary hospital in just 20 days, providing increased capacity for the NHS following the outbreak of COVID-19.
Great Ormond Street Hospital (GOSH) Khoo Teck Puat iMRI Suite
Our Great Ormond Street Hospital (GOSH) iMRI project involved the construction of a three-storey building, adjacent to their existing theatres in the centre of their site, for a new iMRI suite and rehabilitation gym. The new MRI scanner was integrated into the new operating theatre to create a seamless brain imaging process during surgeries.
NHS Golden Jubilee Surgical Centre, Clydebank
The new Golden Jubilee Surgical Centre in Clydebank, Glasgow will provide a range of first-class facilities, including theatre suites; a surgical admissions and recovery unit (SARU); a surgical administration space; central sterilising and processing department facilities; endoscopy unit; orthopaedic amenities; outpatient and pre-operative spaces; as well as staff wellbeing spaces.
First Light Pavilion
Award winning £20.5m First Light Pavilion at Jodrell Bank delivered for the University of Manchester. The brand-new discovery centre, which has the largest reinforced concrete dome in Europe, creates a first-class attraction demonstrating Jodrell Bank’s world-leading place in the history of astronomy.
Heatherwood Hospital
The design and build of a £98m state-of-the-art facility using the latest technology to deliver outstanding services to NHS and private patients across Berkshire, Hampshire, and Surrey.
NHS Golden Jubilee
Kier is utilising modern methods of construction (MMC) throughout the build of this surgical centre, including a hybrid pre-cast concrete frame and facade, cast in service support systems, and pre-manufactured riser and corridor service modules.
Royal Brompton Hospital Diagnostic Centre
A new diagnostic centre which combines specialist diagnostic services in one space, providing MRI, CT, ultrasound, echocardiogram, interventional radiology, transoesophageal echocardiogram (TOE) and bronchoscopy scanning facilities in one of the world’s leading heart and lung hospitals.