The Challenge:
Procured through Scape, the project consisted of the refurbishment and remodelling of levels five and six of the Aspect Court building at Sheffield Hallam University to form a Higher Degree Apprenticeship (HDA) space and an Enterprise and Innovation Hub (EIH).
The fifth floor, to be used as the HDA space, required stripping back to the shell, a full refurbishment and new floor layout with mechanical, electrical services and partitions; the sixth floor, the EIH, required new fixtures and fittings, decoration, and a new furniture layout.
The remainder of the building was occupied, meaning that the site team would have to ensure minimal disturbance to occupants and ensure that interference with the site was prevented. In addition, the location of Aspect Court, on a one-way road with very little delivery space, meant that parking and access to the site was restricted.

The Solution:
The building contained asbestos, which was removed prior to our beginning work on site. All internal walls were stripped, along with fixtures, fittings, screens, ceilings, and finishes, and the internal layouts were altered. A new server room was installed on level five, and new walls were created to allow for the installation of new AV equipment.
To prevent disturbance to the staff and students occupying Aspect Court, much of the work was carried out during the summer break. Access for the site team to the 5th and 6th floors was via an external hoist for goods and operatives, allowing these floors to be effectively sealed, containing dust and debris, and reducing noise.
As access to site was restricted with only deliveries permitted to enter the compound. Delivery vehicles were required to offload at Pond Hill or enter and turn in the site compound and drive out.

The Impact:
The site team completed the project early, with zero defects and soft landings utilised to close out minor issues. Sheffield Hallam University were extremely pleased with the result and praised the site team and the high-quality finish, and were able to occupy the building a week earlier than originally planned.
In addition, the project received a Considerate Constructors score of 42, with the site team’s collaboration with the university and corporate social responsibility contribution praised.
" On-site management by both Gareth and Josh was pro-active, with solutions appreciated by Sheffield Hallam University. Construction delivery was good and helps to remove the burden from the university's estates team. "Chris Dales Senior Project Manager Sheffield Hallam University
View more projects
Every project we deliver is an opportunity for us to bring our unique thinking to solve problems, innovate and collaborate with our clients and beyond.
Berkeley Green & UTC South Gloucestershire & Stroud College (SGS)
Rising from the ashes of a decommissioned former nuclear site, SGS Berkeley Green, a converted 1940’s engineering hall, and new University Technical College (UTC) are the first educational buildings to be completed on a new ground-breaking GREEN campus, within Gloucestershire Science and Technology Park.
St Albans Place
Constructing an 18-storey, concrete-framed student accommodation block in the centre of Leeds, close to the A64, consisting of 376 studios with communal dining areas, cinema room, gym, coffee lounge and a management suite.
St Julie’s Catholic High School
Building a new school for 1,100 students within the grounds of the original. Abiding by strict environmental regulations and generating a wealth of social value within the local community.
Park Hill
Refurbishing phase three of the derelict, Grade II-listed Park Hill Flats estate to form 356 bedrooms of student accommodation while respecting the identity and integrity of the iconic building.
Astrea Academy Sheffield - Secondary School
Construction of a secondary school to create much-needed school places in north east Sheffield
Cheltenham Ladies College, Fitness Centre
The addition of high-class sport and leisure facilities for one of the UK’s most distinguished private schools has created flexible, multi-purpose spaces wrapped around the existing centre. Alongside a new sports hall, activity studios, squash courts and a gym, are additional changing rooms, a MUGA and new car park.
3 Sovereign Square
Developing a new, six-storey office building in central Leeds, ensuring the design blended in with the surrounding historic buildings, using lean planning to ensure the smooth running of the project, applying innovative thinking to the build, and achieving an Excellent BREEAM sustainability rating.
Astrea Academy Sheffield - Primary School
Restoring a listed local landmark to its former glory to create a brand-new school for North East Sheffield.
NHSBT Barnsley
Fit-out of a new, purpose-built development in Barnsley for use by NHS Blood and Transplant as a specialist research, storage, and logistics facility for the wider NHS, replacing facilities in Sheffield and Leeds to ensure efficiencies and improve services.
Stephen Perse Foundation
The design and construction of a new teaching block and first-class sports facilities.
St Mary’s RC Primary School, Malton
Constructing a new annexe as well as a reconfiguration of the existing school in order to ease pressures on pupil oversubscription.
Dixons Sixth Form
Refurbishment and fit-out of a six-storey 19th-century mill building and coach house with a new build sports hall in Bradford for Dixons Academies Trust, maintaining the building’s heritage and ensuring it is suitable for teaching.
Chemistry of Health, University of Cambridge
Providing space for the study of neurodegenerative disorders such as Parkinson’s and Alzheimer’s.
York Hospital, Endoscopy Unit
Construction of a new build steel-framed £9m endoscopy unit on top of the existing physiotherapy building at York Hospital
Aspect Court Refurbishment
£1m refurbishment of levels five and six of Sheffield Hallam University’s Aspect Court building to create space for degree apprenticeship students and an innovation hub
Diana Princess of Wales Hospital Staff Accommodation
Construction of new staff accommodation at Diana, Princess of Wales Hospital for staff and student nurses
The Springfield Sixth Form Centre, Dewsbury Learning Quarter
Construction of the Springfield Sixth Form Centre, beginning the development of the Dewsbury Learning Quarter for Kirklees College
The David Attenborough Building
Updating an icon, providing pride of place for Charles Darwin’s finds, creating a prominent spot for a fully-fledged Finback whale, and being test abseiled by Sir David Attenborough.
Stowlawn Primary School
Procured through the Scape National Minor Works Framework, this scheme involved the construction of a new primary school provision at the existing Stowlawn Primary School in Bilston, Wolverhampton. Unique to this project was the building’s existing Passivhaus principals and bespoke brickwork façade.
Spring Vale Primary School
Procured through the Scape National Minor Works Framework, this extension and remodelling project has increased the School’s capacity whilst improving their Ofsted rating from ‘Good’ to ‘Outstanding’.
Stonegate
The Stonegate development will see 113 new homes providing a range of 2, 3, 4 and 5 bedroom properties.
University of Essex STEM Centre
Creating a state of the art teaching centre for science, technology, engineering and mathematics (STEM).
Waterside Student Residences
A joint venture with Kier Major Projects for the University of Northampton. The project marked the first time Kier had committed to a large-scale Light Gauge Steel (LGS) frame project and is the largest LGS project to date in the UK.
Sheffield North Active
Transforming a tired council facility into a modern new leisure centre in the north of Sheffield, adhering to Sport England guidelines and taking on board local concerns, introducing a bold exterior design and keeping to tight deadlines.
Sensor City
Creating a ‘Knowledge Quarter’ for Liverpool, a collaboration between the University of Liverpool and Liverpool John Moores University, delivering a highly adaptable research environment and incubator space for start-ups and SMEs who are developing digital sensor technologies and applications.
Sainsbury Wellcome Centre
A unique, world-class, state of the art neuroscience research institute at University College London.
Slade Green Regeneration
The simultaneous extension and refurbishment of two neighbouring primary schools.
Yr Egin Media and Office Development
Bringing an iconic and sustainable development to the Carmarthen campus of the University of Wales, providing 40,000 sq. ft. of accommodation for for Welsh Media company S4C and the University's new media faculty and offices, and achieving a BREEAM Excellent certificate for sustainability.
Falmouth School Sports Pavilion
The design and construction of a sports pavilion, including FA compliant changing facilities, gym, office space and flexible recreation areas. In addition a first floor balcony was incorporated into the design which overlooks the sports pitches.
Cathedral School
Creating a two-form entry primary school within a Grade 1 listed building.
Princes Gate Retail Park
Creating a new retail and leisure heart for the town comprising 23 shops, restaurants and bars, together with a multi-screen Empire cinema, 60 bed Premier Inn hotel and a 345 space car park.
Harris Girls' Academy Bromley
The demolition, refurbishment and three-story new build of a local all-girls school located in South London.
Oakwood High School
New build secondary school developed under the Education Skills and Funding Agency's (ESFA) Priority Schools Building Programme (PSBP), providing modern accommodation with increased pupil capacity and facilities for classrooms, in addition to a Learning Resource Centre which integrates with pupil breakout areas.
National Transport Design Centre
The UK – and Coventry as a city - is well-established as a leader in automotive, aerospace, rail and marine design. Coventry University’s National Transport Design Centre (NTDC) aims to boost design innovation in the transport sector and bridge the current shortfall in creative skills.
Rotherham Hospital Integrated Urgent Care Centre
Developing a new build Integrated Urgent Care Centre over two storeys at Rotherham Hospital, with refurbished and extended level B areas for new Fractures, Majors, Resuscitation and RAT departments.
Elland Bridge Refurbishment
Rebuilding the Elland Bridge after the 19th century original was completely destroyed in the 2015 Boxing Day floods.
Don Valley Academy
New build secondary school developed under the ESFA’s Priority Schools Building Programme (PSBP), providing modern accommodation with increased pupil capacity for 1,200 pupils and 300 post-16 students.
Caol Joint Primary School Campus
Designing and constructing of a new joint campus school for The Highland Council to incorporate two neighbouring primary schools, Caol Primary School and St Columba's RC Primary School, together with a community facility.
Tri-Link 140, Normanton
This scheme provides an excellent industrial and warehouse opportunity, incorporating 136,231 sq ft warehouse and 6,107 sq ft of office space.
Huntington Community Primary School
Blending traditional and innovative solutions to create a new-build, two-storey, 420-place primary school and 26-place nursery in Chester.
The Grove School
Undertaking a major refurbishment of a former Council building, originally a late Edwardian school, into a new school in Haringey, for 104 students aged 5–19 who have a primary diagnosis of autism.
Tiger Way
Kier Design and Business Services working in partnership with the London Borough of Hackney to deliver mixed-use developments and education schemes to create revenue for further local investment.
Aureus Secondary School
Delivering a new secondary school on the Great Western Park Development in Didcot, ensuring it was completed in time for the start of the new school year, creating extensive outdoor sports facilities as well as a building for 1,200 students and working alongside contractors delivering housing projects.
Sheffield Hallam University Robert Winston Annexe
£1.4m installation of a modular, two-storey extension onto Sheffield Hallam University’s Robert Winston Building, located on SHU’s Collegiate Campus.
Working Roots
Setting up and running a project aimed at giving unemployed young people the opportunity to work on variety of projects at Kier North Tyneside, working with North Tyneside Council and Justice Prince ( a community interest company), and helping the young people learn new skills and grow in confidence.
The Chase SEN
Converting and regenerating a disused engineering building at South Gloucestershire and Stroud College to create striking new modern facilities for disabled students.
Alperton Community School
The build of a new school and demolition works of the old premises, increasing capacity from 750 to 1700 pupils.
PET-MRI Facility, Royal Hallamshire Hospital
Construction and fit-out of a concrete-framed, two-storey PET-MRI facility at the Royal Hallamshire Hospital in Sheffield, a joint project for the University of Sheffield and Sheffield Teaching Hospitals NHS Foundation Trust.
Q Floor, Royal Hallamshire Hospital
Refurbishment of the Royal Hallamshire Hospital’s Q Floor from ward space into four new orthopaedic theatres, recovery area, staff changing, support stores and additional ancillary areas, located on the 14th floor of the hospital
Degree Apprenticeship Centre
Revolutionary in its design, the first Degree Apprenticeship Centre on the Warwick University Campus marks a new stage in the University’s teaching programme. The new three-storey 2,400m² innovative development centre provides a bridge from education to industry.
Bartholomew School
Enhancing the estate of an already ‘outstanding’ Ofsted school to provide up-to-date facilities, fit for 21st-century learning.
Woolwich Polytechnic School for Girls
Building a brand new 8 form of entry school situated in Thamesmead in South East London. The new school holds 1,200 pupils and includes teaching spaces, science laboratories, ICT suites, a dance studio, art and music rooms plus a large four court sports hall and hard court play area.
The Institute for Innovative Materials, Processing and Numerical Technologies (IMPACT)
New state-of-the-art research centre, the Innovative Materials, Processing and Numerical Technologies (IMPACT) building, situated on the Swansea University Bay Campus provides future proof, highly specialised laboratories for fundamental and applied research and delivers a high impact, transformative research environment for industry and academia to collaborate in advanced engineering and materials.
Hawthorne Primary and Nursery School
A modern primary school in Bestwood, Nottinghamshire, for an expanding local community that involved pupils throughout the build delivered through the Scape Minor Works Framework by Kier and Arc Partnership
Swansea IQ and YFforwm Development (SA1)
Delivering £32m first phase of new Swansea Waterfront Innovation Quarter to provide a 21st-century state of the art education facility to attract students from all over the world to the University of Wales Trinity St David.
Springhead Park Primary School
Springhead Park Primary School is a brand new modular two-form of entry with additional 26 nursery spaces in Ebbsfleet, Kent. The new schools holds 420 pupils ages from 3 – 11. The building includes teaching space, food tech facilities, science laboratories, multi-use agency space and hard court play area.
Northstowe Secondary College
Delivering a 600 place Secondary School with 12 form of entry core facilities, as well as a 110 place SEN School and Energy Centre for Cambridge Meridian Academies Trust (CMAT) on behalf of Cambridgeshire County Council.
Alness Academy – virtual transition model
With Covid-19 restrictions preventing in person site visits, our virtual transition model supports pupils and teachers to familiarise themselves with their new building and access useful information to support their transition and adjustment to the new school environment.
Leaving a lasting legacy: Croesyceiliog Comprehensive School
Construction of a new £30m building for Croesyceiliog Comprehensive School, providing 1,200 school places and ensuring social value was delivered throughout the project.
Iffley Academy
New-build construction of a community Special Academy judged ‘outstanding’ by Ofsted in 2019, for pupils up to the age of 18 with complex special educational needs and disabilities. The new academy replaces unfit for purpose old buildings, adding animal care, horticulture and construction facilities, a mock flat and pupil-run café.
Whitelands Academy, Kingsmere
A brand new 600 pupil secondary academy school for years 7-11, built to support Kingsmere, a new housing development in south-west Bicester. Constructed to BREEAM principles, the academy features 26-classrooms, SEN provision, a four-court sports hall built and fitted to Sport England standard, external social spaces and multi-use games areas.
Simon Langton Girls’ Grammar School
Design and construction of two replacement buildings as part of a 1,100 pupil school in Canterbury, Kent, providing 7,500m² of teaching space across a range of traditional classrooms and learning areas with specialist areas for art, science and technology. The second phase, currently underway, includes asbestos clearance, demolition of the existing school buildings, construction of a car park and MUGA area.
Spa School, Camberwell
Spa School Camberwell is a co-educational special school for students aged 5 to 16 with autism. Construction works included the structural alteration, internal remodelling and fit out of a three storey Victorian building with a three storey new build extension. It has the capacity for 120 students and 80 staff.
Cattle Market Road, Bristol
Saving carbon, fuel and costs through the use of Solar Hybrid Towers at Cattle Market Road site in Bristol
Ponteland School & Leisure Centre
Ponteland School & Leisure Centre features a 420-place primary school and a 1,600-place secondary school, a state-of-the-art leisure centre with swimming pools, aqua play, spa, gym, climbing walls, dance studios, soft play zone, a 3G sports pitch, bar, cafés, library and a new community fire station.
Ebbsfleet Green Primary School
The design and construction of a new modular build 2FE primary school within Ebbsfleet Garden City, Kent, catering for students ranging from nursery to year six. The school also includes specialist resources for up to 15 pupils with a diagnosis of Autism Spectrum Disorder plus a 26-place nursery.
The Heights Primary School, Reading
Constructing a new primary school to address the shortage of pupil places in Reading, Berkshire.
Netherthird Primary School
We have been appointed by East Ayrshire Council to deliver the £8.5m new build Netherthird Primary School in Cumnock. The new school will accommodate 278 pupils in nine classrooms with four supported learning spaces and a new outdoor learning zone and play area.
First Light Pavilion
Award winning £20.5m First Light Pavilion at Jodrell Bank delivered for the University of Manchester. The brand-new discovery centre, which has the largest reinforced concrete dome in Europe, creates a first-class attraction demonstrating Jodrell Bank’s world-leading place in the history of astronomy.
Addington Valley Academy
Design and construction of an all through SEND school, funded by the Department for Education and managed by Orchard Hill College Academy Trust. The school specialises in autism and complex needs for up to 150 pupils aged 2–19 and offers a wide variety of special learning environments including sensory/calm spaces and emotional literacy support rooms.
Creative Centre
A state-of-the-art, cross-disciplinary home for York St John University’s music and computer science departments, alongside world class facilities for the performing arts, creative writing and media production.