The Challenge:
Exeter City Council are currently working with Kier to build a new state of the art leisure centre, procured through the Southern Construction Framework (SCF). Situated in Exeter city centre, the new leisure centre will replace an existing, aging building and incorporate a range of facilities, including:
• Main swimming pool & learners pool with moveable floors
• Confidence water pool
• 100 seat spectator seated area
• Café to seat 50
• 150 station fitness gym and two fitness studios
• Health suite and spa facility
• Children’s soft play area
Fitting with Exeter’s wider green initiatives, the project is being built using the ultra-energy efficient Passivhaus standard. Once complete, the building is designed to save up to 70% on annual energy costs.

The Solution:
St Sidwells Point will be the first UK leisure facility built to the Passivhaus standard. In order to achieve the stringent build criteria, Kier has worked closely with its subcontractors to deliver a ‘Passivhaus Passport’ training scheme, equipping its staff with the knowledge and skills to meet the requirements.
Working closely with Building Greater Exeter, we have used the project to showcase the range of opportunities in the construction market, working with them to inspire young people and provide opportunities for apprentices, up-skilling and re-skilling.
Work started on site in January 2019 and will take around two years to complete.

The Impact:
Once open, St Sidwells Point leisure centre is expected to attract around 500,000 visits a year, twice the amount of the previous leisure centre.
Due to ultra-filtration, the pools will have exceptional water quality with minimal chemical content, which will greatly improve the experience for swimmers compared to a standard pool.
The building has been modelled to withstand predicted changes in climate conditions up to 2080. Saving up to 70% on annual energy costs in comparison to lower efficiency building techniques.
View more projects
Every project we deliver is an opportunity for us to bring our unique thinking to solve problems, innovate and collaborate with our clients and beyond.
Berkeley Green & UTC South Gloucestershire & Stroud College (SGS)
Rising from the ashes of a decommissioned former nuclear site, SGS Berkeley Green, a converted 1940’s engineering hall, and new University Technical College (UTC) are the first educational buildings to be completed on a new ground-breaking GREEN campus, within Gloucestershire Science and Technology Park.
Butlin’s Splash, Bognor Regis
Building a £40m state of the art swimming pool and leisure complex within the existing Butlin’s resort in Bognor Regis, West Sussex.
Southern Resilience Scheme
Delivering a new £27m and 30.5km pipeline for Bristol Water, overcoming biodiversity and sustainability issues, handling the logistics presented by the pipeline passing through five towns and bringing improved water supply to 280,000 customers.
Hinkley Point C
Major Earthworks project to prepare for construction of UK’s first nuclear power station for a generation.
Trago Mills
Developing the first site outside Devon and Cornwall for Trago Mills, an independent, family owned and run discount leisure retailer. Bringing much needed employment to the area it includes 11 retail units, external sales area, café, garden centre, goods yard, ice cream stall, bandstand, adventure dome and model railway.
Global Student Accommodation (GSA), Exeter
We completed Clifford House, a student housing association project, for Global Student Accommodation (GSA), two weeks early. It’s our second project for GSA and provides state-of-the-art student accommodation for 312 students studying at Exeter University.
Gloucester Transport Hub
A unique and distinctive regeneration project promoting Gloucester’s unparalleled heritage from archaeology to aviation. The Hub is a highly symbolic part of the rejuvenation of the main entry point into the city, a gateway used in Roman times which is now served by both road and rail.
Cheltenham Ladies College, Fitness Centre
The addition of high-class sport and leisure facilities for one of the UK’s most distinguished private schools has created flexible, multi-purpose spaces wrapped around the existing centre. Alongside a new sports hall, activity studios, squash courts and a gym, are additional changing rooms, a MUGA and new car park.
Congresbury Yeo tidal defences
Kier worked as part of Team Van Ord (TVO) to improve the standard of protection provided to 39,741 properties in the towns and villages of Worle, Weston-Super-Mare, Kingston Seymour and Wick St Lawrence by improving the 3670m of earth bank tidal defences lining the Congresbury Yeo Estuary.
St Sidwells Point Leisure Centre
Creating the UK’s first Passivhaus standard ultra-low carbon leisure centre, designed to save up to 70% on annual energy costs.
The Steart Coastal Management Project
Kier worked as part of Team Van Ord (TVO) on The Steart Coastal Management Project which was the UK’s largest coastal management scheme, helping to protect homes and business from flooding due to climate change and rising sea levels.
Aerospace Bristol
Creating a new £19m aviation museum showcasing the role played by the Bristol site in Britain’s aviation history, including a hangar to house the last Concorde ever to fly, restoring a Grade 1 listed First World War hangar to create an exhibition space
5 Pancras Square
One of the most sustainable mixed-use building in the country and winner of the Prime Minister’s Better Public Building award.
Everards Meadows Phase 1A
Creating a vibrant destination in Leicestershire, incorporating a new cycle centre and cafe as well as site-wide green infrastructure.
Storyhouse
Developing Chester's largest and most ambitious ever creative project, working in a restricted city centre location, adapting the programme when a Roman building was discovered on site, restoring and revitalising a Grade II Listed building, creating new cultural spaces and receiving the Arts Council's highest ever score for a building.
Everards Meadows Phase 1B
Working collaboratively with Everards to regenerate land previously occupied by their brewing facilities, for the benefit of the people of Leicestershire.
Cheltenham Racecourse Redevelopment
Delivering a new 6,500-capacity 5 ½ storey grandstand at one Britain’s most iconic racecourses.
North Sea Observatory
A unique purpose-built marine observatory on the Lincolnshire coastline.
Stolford Flood Defence Scheme
Kier installs first Dutch flood protection system in UK to help Environment Agency protect Somerset homes and agricultural land.
Aberdeen Music Hall
Restoring, renovating and extending this prestigious Grade A listed performing arts building, utilising building conservation techniques whilst internally upgrading the interiors and finishes to a high quality and installing new, modern building services and a/v equipment throughout.
Browns Hill & Horn Hill Steps, Water Main Replacement
Mains replacement scheme in historically sensitive area.
Reading Gateway
Identifying this 20.5 acre site in Reading as a strategic development opportunity, delivering a retail and leisure scheme including new homes, a hotel, retail space, car showrooms and industrial units, trailing new innovations and generating 263 jobs and £138m of social value.
MEICA Capital Works Framework
Kier delivers work for South West Water (SWW) under the ‘MEICA Capital Works Framework’, a multi-disciplinary framework for maintenance, refurbishment and the expansion of water treatment and sewage treatment works.
FA Parklife
As part of the Football Association’s master-plan to build new football facilities in 30 cities by 2020, Kier have successfully delivered four all-purpose football hubs using state of the art 3G artificial grass at key grass-root areas across Liverpool.
The Aperture
The Aperture is the first phase of residential buildings on the Greenwich Peninsula. This five storey building comprises of a restaurant and deli on the ground floor, day nursery on the first floor, estate management and a community centre on the second/third floors with a gym on the remaining floors.
Hampton by Hilton, Bristol Airport
The construction of a hotel consisting of 201 bedrooms over four floors, utilising significant offsite manufacture.
Trade City and Logistics City
Developing more than six million sq ft of award winning speculative industrial space, with sizes ranging from small start-up to national distribution units through Kier Property's Trade City and Logistics City brands.
St Mary’s Harbour
Kier used our marine expertise to undertake improvement works to St Mary’s Harbour on the Isles of Scilly, located within areas of national and international environmental and ecological protection.
Sheffield North Active
Transforming a tired council facility into a modern new leisure centre in the north of Sheffield, adhering to Sport England guidelines and taking on board local concerns, introducing a bold exterior design and keeping to tight deadlines.
Glasgow Fort
Constructing a new retail unit that included remodelling existing car parks, a major re-alignment of the existing spine road - including removal of roundabouts - significant public utility services diversions and installation of toucan crossings.
Walsall Waterfront Leisure
Completing the penultimate phase of the £65m waterfront development, taking it through the planning process, regenerating over 17 acres in Walsall including The Light Cinema and popular national restaurant chains, making the most of a canalised location and engaging with the local community.
Watford Riverwell
Delivering the £450m Watford Riverwell as a 15-20 year joint venture with Watford Borough Council, which involves regenerating 70 acres of land in West Watford to create residential, office, retail, leisure, industrial and hotel space.
Falmouth School Sports Pavilion
The design and construction of a sports pavilion, including FA compliant changing facilities, gym, office space and flexible recreation areas. In addition a first floor balcony was incorporated into the design which overlooks the sports pitches.
Cathedral School
Creating a two-form entry primary school within a Grade 1 listed building.
Camberley Town Centre
Create a mixed-use regeneration scheme on this strategic site.
Princes Gate Retail Park
Creating a new retail and leisure heart for the town comprising 23 shops, restaurants and bars, together with a multi-screen Empire cinema, 60 bed Premier Inn hotel and a 345 space car park.
Motel One
Transforming a derelict building into a 172 bedroom modern boutique hotel, retaining and preserving many historic features uncovered during the work.
Lyneham Defence Technical Training Centre
Redeveloping RAF Lyneham as a world-class Ministry of Defence training centre.
Gibraltar Point Visitor Centre
Creating a new visitor centre at this Site of Special Scientific Interest after the previous one was damaged by a tidal surge, ensuring its protection from flooding and its coastal position, incorporating sustainable features and refurbishing an 1800s coastguard building to be used as an exhibition space.
Finlake Leisure Pool
Designing and constructing a new leisure complex within this holiday village on the edge of the Dartmoor National Park in Devon, including toddler and 20m adult swimming pools, Tornado and Twister flume rides, and water playground, gymnasium, other leisure facilities and associated plant and equipment.
Crewe Lifestyle Centre
Creating a viable and affordable facility that brought all Crewe's lifestyle services - pool, gym, sports hall, library, specialist daycare and family service facilities - together under one roof, meeting a diverse range of user needs and building within a constrained town centre site.
New water mains connection
Customers benefit from innovation delivering a faster new connection in Newton Abbot.
Oldham Town Hall
Restoring an iconic building, taking part in feasibility studies to decide the best use of the building, working on the project to turn it into a seven-screen cinema with restaurants, coffee shop and retail units, winning multiple industry awards and creating something of huge importance to local people.
The Chase SEN
Converting and regenerating a disused engineering building at South Gloucestershire and Stroud College to create striking new modern facilities for disabled students.
Wedge House
Building a striking new build boutique hotel with works comprising the design, construction and fit out of 192 hotel rooms, 4,700m2 Cat A office space and full fit out of three floors of bars and restaurants.
Dyson, Hullavington
The design and redevelopment of a World War II hanger, to create a new research and development centre for Dyson.
Shire Hall
The re-emergence of Gloucestershire County Council’s (GCC) Shire Hall after its retrofit and refurbishment reads like a fairy-tale. Over 165 weeks and 82 phases of collaborative, innovative team-working, the part-listed, part 1960’s building, an eyesore, tired and inefficient, was responsibly and dynamically transformed into an elegant and highly sustainable workplace.
Plymouth Central HUBER alternative dewatering scheme
Replacing existing ageing centrifuge assets with a, first of its kind, application of the HUBER Q-Press. This improved odour control measures, reduced chemical consumption and halved annual operating costs at Plymouth Central Sewage Treatment Works, as part of South West Water’s MEICA Framework.
NHS Nightingale Bristol
Converting the University of West England conference centre into a temporary hospital in just 20 days, providing increased capacity for the NHS following the outbreak of COVID-19.
Keeping customers connected during COVID-19
Providing a 24/7 reactive service to South West Water during the COVID-19 lockdown to ensure the network could cope with increased water demand. Adopting new ways of working to maintain social distancing.
Ecclesiastical Insurance Group Headquarters
Ecclesiastical Insurance Group, one of Gloucester’s biggest employers, had offices throughout the city which were not considered future proof. They decided to consolidate all Gloucester based staff into a new purpose-build headquarters on Gloucester Business Park. The building is leased from Arlington, owners of the business park, and long-term clients of Kier.
Loe Bar Outfall Winter Readiness
Replacing eroded concrete along a 40m length of Loe Bar Outfall by spraying concrete on the front and top face of the outfall and around the inspection chamber. The works had to be completed by the end of October 2020.
Helston (River Cober) Flood Alleviation Scheme
The development of a CL:AIRE Materials Management Plan (MMP), enabled the use of soils, which would normally be classified as waste, from a local development site within flood banks on the Helston (River Cober) Flood Alleviation Scheme, Helston, West Cornwall.
Iffley Academy
New-build construction of a community Special Academy judged ‘outstanding’ by Ofsted in 2019, for pupils up to the age of 18 with complex special educational needs and disabilities. The new academy replaces unfit for purpose old buildings, adding animal care, horticulture and construction facilities, a mock flat and pupil-run café.
Whitelands Academy, Kingsmere
A brand new 600 pupil secondary academy school for years 7-11, built to support Kingsmere, a new housing development in south-west Bicester. Constructed to BREEAM principles, the academy features 26-classrooms, SEN provision, a four-court sports hall built and fitted to Sport England standard, external social spaces and multi-use games areas.
Clearwater Primary Academy
A ‘Forever Home’ for a nomadic Primary School which originally operated from dilapidated portacabins and then moved to occupy converted offices with no playground. The new Academy is a spacious home to 67 pupils but allows for 420-student capacity as the new housing developments in the area become occupied.
Cattle Market Road, Bristol
Saving carbon, fuel and costs through the use of Solar Hybrid Towers at Cattle Market Road site in Bristol